A cricket bat manufacturing firm assesses its variable cost to be , where is the number of bats produced, and the fixed cost incurred on storage is . How many bats should be manufactured for the minimum total cost?
- A14 Bats
- B12 Bats
- C20 Bats
- D6 Bats
Solution & Step-by-step Explanation
Total Cost $
$
To find the minimum cost, we find the derivative and set it to zero:
Setting :
Check the second derivative: .Since , corresponds to a minimum.
$
To find the minimum cost, we find the derivative and set it to zero:
Setting :
Check the second derivative: .Since , corresponds to a minimum.